The idea, step by step
Make the modelling choices explicit
Start with the question: what must be predicted? Name the input, output and units. A direct-proportion model is reasonable only when the unit rate stays constant and there is no fixed initial amount.
Obtain from suitable data, use the rule, then check a second observation if one is available. Report the result in context rather than stopping at an unexplained number.
| Wall area (m²) | Paint (L) |
|---|---|
| 12 | 1.5 |
| 20 | 2.5 |
| 28 | 3.5 |
A model is useful within conditions
A constant paint-coverage model assumes the same surface, paint, number of coats and wastage. Extending it to rough brick or a second coat without adjustment would be unjustified.
Compare a prediction with a new measurement. A small discrepancy might be rounding or measurement error; a consistent change in unit rates suggests changing the model. Also consider practical constraints: paint cans and buses may need whole-number purchases even when the model gives a fraction.
A common trap
A proportional prediction remains reliable for any input size.
Instead: The constant rate and practical conditions must remain suitable. Check restrictions, available data and whole-number decisions before trusting an extrapolation.
See the thinking
A paint model
Use the supplied paint data to estimate the amount for 44 m² under the same conditions.
- L/m².
- Check: and .
- Predicted paint is L.
Reject an unsuitable proportional rule
A coach quote is 440 dollars for 20 students and 560 dollars for 30 students. Is a constant cost per student supported?
- Unit costs are and dollars/student.
- They differ, so one direct-proportion cost rule is not supported.
- Both quotes fit a fixed 200 dollars charge plus 12 dollars per student: .
Check your understanding
A model predicts 2.4 identical buses. What decision is needed if all passengers must travel?
Show answer
Hire at least 3 buses.
Buses are whole objects; rounding down would leave passengers without seats.
Your turn
6 questions · 14 marks · Work at your own pace.
Read the questions online
- A constant-rate model uses 3 L of cleaner for 24 m². State the rate in L/m².2 marks
- Use that model to predict cleaner for 60 m².2 marks
- State two conditions needed before applying that cleaner model to another room.2 marks
- A prediction is 7.5 L. Cleaner comes only in 4 L containers. How many are needed?2 marks
- A machine produces 30 items in 2 minutes and 75 in 5 minutes. Does a proportional model fit? Find its rule.3 marks
- The same machine needs 3 minutes to warm up before producing items. Explain why total items are not directly proportional to time measured from switch-on.3 marks
Read the worked solutions
Equivalent correct methods earn the corresponding marks. Include units where asked.
- A constant-rate model uses 3 L of cleaner for 24 m². State the rate in L/m².2 marks
L/m².
0.125 L/m² - Use that model to predict cleaner for 60 m².2 marks
L.
7.5 L - State two conditions needed before applying that cleaner model to another room.2 marks
The rate may change with surface, dilution, number of applications or wastage.
For example: same surface type and same cleaning method/strength. - A prediction is 7.5 L. Cleaner comes only in 4 L containers. How many are needed?2 marks
containers.
Round up to 2; they supply 8 L.
2 containers - A machine produces 30 items in 2 minutes and 75 in 5 minutes. Does a proportional model fit? Find its rule.3 marks
Both rates equal items/min.
The rule gives zero output at zero production time, assuming no startup loss.
, with t in minutes. - The same machine needs 3 minutes to warm up before producing items. Explain why total items are not directly proportional to time measured from switch-on.3 marks
During the first 3 minutes, output is zero.
After warm-up, for ; this is not from switch-on.
The warm-up period introduces a delay.
Curriculum reference & lesson scope
Australian Curriculum v9 and SA Curriculum Mathematics
Year 9 proportional modelling, rates, scale, similarity and enlargement. Assumptions, interpretation and model limitations are taught alongside calculation.
Official curriculum source ↗