Define what best means

Constraints say what is allowed; the objective says what to improve. State whether to maximise or minimise. Profit uses selling price minus unit cost, not selling price alone. A fixed cost shifts every objective value by the same amount and therefore does not change which feasible decision is best when all other conditions stay unchanged.

A family of parallel lines

For P=a⁢x+b⁢y, each fixed P-value produces a straight line. Changing P shifts it without changing its gradient. On a non-empty bounded polygon a linear objective has an optimum at a vertex. If it is constant along a feasible edge, all points on that edge are optimal; the result is not necessarily unique.

P=a⁢x+b⁢y

A common trap

A resource expression is automatically the objective.

Instead: A resource expression measures something limited; an objective measures the quantity being optimised.

02 / WORKED EXAMPLES

See the thinking

Example 1

Profit rather than revenue

Basic kits sell for AUD 18 and cost AUD 11. Deluxe kits sell for AUD 26 and cost AUD 15. Write profit for x basic and y deluxe kits; evaluate at (6,4).

  1. Unit profits are 7 and 11 dollars.
  2. Thus P=7⁢x+11⁢y.
  3. At (6,4), P=42+44=86.
P=7⁢x+11⁢y; AUD 86.
Example 2

Compare corners

A region has vertices (0,0),(5,0),(3,4),(0,6). Maximise P=4⁢x+5⁢y.

VertexP
(0,0)0
(5,0)20
(3,4)32
(0,6)30
  1. Objective values are 0,20,32,30 in the given order.
  2. The largest value is 32.
  3. A linear objective on a bounded polygon attains an optimum at a vertex.
Maximum 32 at (3,4).

Check your understanding

Write profit when each x earns AUD 9 and each y earns AUD 4. Evaluate at (2,7).

Show answer

P=9⁢x+4⁢y; AUD 46.

18+28=46.

03 / WORKSHEET

Your turn

6 questions · 12 marks · Work at your own pace.

Read the questions online
  1. A has unit revenue 35 and cost 23; B has revenue 28 and cost 19. Write profit.
    2 marks
  2. Evaluate C=8⁢x+13⁢y at (4,3).
    2 marks
  3. At vertices (0,0),(8,0),(4,5),(0,7), maximise P=3⁢x+4⁢y.
    2 marks
  4. At vertices (2,3),(7,3),(4,6), minimise C=5⁢x+2⁢y.
    2 marks
  5. Does subtracting a fixed AUD 100 change the maximiser of P=7⁢x+5⁢y?
    2 marks
  6. Why does every point from (0,6) to (6,0) have the same P=2⁢x+2⁢y?
    2 marks
Read the worked solutions

Equivalent correct methods earn the corresponding marks. Include units where asked.

  1. A has unit revenue 35 and cost 23; B has revenue 28 and cost 19. Write profit.
    2 marks

    Subtract each unit cost from revenue first.

    P=12⁢x+9⁢y.
  2. Evaluate C=8⁢x+13⁢y at (4,3).
    2 marks

    32+39=71.

    71.
  3. At vertices (0,0),(8,0),(4,5),(0,7), maximise P=3⁢x+4⁢y.
    2 marks

    The values are 0,24,32,28.

    Maximum 32 at (4,5).
  4. At vertices (2,3),(7,3),(4,6), minimise C=5⁢x+2⁢y.
    2 marks

    The values are 16,41,32.

    Minimum 16 at (2,3).
  5. Does subtracting a fixed AUD 100 change the maximiser of P=7⁢x+5⁢y?
    2 marks

    All objective values decrease equally, preserving their order.

    No, if the feasible set stays unchanged.
  6. Why does every point from (0,6) to (6,0) have the same P=2⁢x+2⁢y?
    2 marks

    On that edge x+y=6, so P=2⁢(x+y)=12.

    Each has P=12.
Checking saved progress…

Continue learning

Linear programming

Next lesson
Curriculum reference & lesson scope

SACE Board of South Australia

Stage 2 General Mathematics: Modelling with Linear Relationships, a compulsory school-assessed topic. The external examination scope differs from the full course.

Official curriculum source ↗
Back to Linear models and optimisation

Save your next step.

Create a free account to save your learning progress. Lessons and downloads stay free, with or without an account.

Create free account