Networks, scheduling and assignment.

Plan projects with precedence networks and critical paths, then allocate people and resources using assignment models.

13 lessons6 practice tests

Work through the topic

Learn the method, follow the examples, then try the worksheet.

  1. 01

    Precedence tables

    Translate task descriptions into immediate-predecessor tables without adding dependencies that the project does not need.

    18 min · Worked examples & worksheet
  2. 02

    Directed project networks

    Represent a project's dependencies with activity arrows and numbered events, then read the network without confusing arrows and vertices.

    18 min · Worked examples & worksheet
  3. 03

    Dummy activities

    Use zero-duration dummy arrows to show dependencies correctly in an activity-on-arrow network.

    18 min · Worked examples & worksheet
  4. 04

    Forward and backward scans

    Calculate earliest event times forwards and latest event times backwards, using max at a merge and min at a split.

    20 min · Worked examples & worksheet
  5. 05

    Earliest/latest times

    Turn event times into earliest and latest start/finish times for individual activities.

    20 min · Worked examples & worksheet
  6. 06

    Critical paths

    Find every controlling start-to-finish chain and explain why a critical path is a longest path, not a shortest one.

    20 min · Worked examples & worksheet
  7. 07

    Minimum completion time

    Interpret the network's earliest finish as a lower bound under stated assumptions, and test how time reductions change that finish.

    20 min · Worked examples & worksheet
  8. 08

    Slack and changes to activities

    Calculate total float and assess delays or reductions without assuming every allowance can be used independently.

    20 min · Worked examples & worksheet
  9. 09

    Assignment cost tables

    Read an assignment table, enforce the one-person/one-job constraints and evaluate complete assignments using the original entries.

    22 min · Worked examples & worksheet
  10. 10

    Hungarian algorithm

    Use row and column reductions, independent zeros and a justified adjustment to solve a minimum assignment.

    22 min · Worked examples & worksheet
  11. 11

    Minimum-cost and maximum-profit assignments

    Choose the correct optimisation direction and convert a profit problem into a minimum-cost assignment without changing the best pairing.

    20 min · Worked examples & worksheet
  12. 12

    Rectangular tables and dummy rows/columns

    Balance a rectangular assignment table with meaningful dummy entries and distinguish an idle worker from an uncompleted required job.

    20 min · Worked examples & worksheet
  13. 13

    Checking assumptions and interpreting recommendations

    Translate a numerical optimum into a defensible recommendation, including resource limits, unavailable pairings and model uncertainty.

    20 min · Worked examples & worksheet
AFTER THE LESSONS

Topic review

Revisit the key ideas, then choose a practice paper.

6 practice tests · Separate worked marking guides